Difference between revisions of "Running Overload"

From WikiDubs
Jump to navigation Jump to search
(Created page with "===Before test=== * Verify control is good by using taps or PWM to run motor, then verify control communicates to appropriate dev tool. * Fixture control on heat resistant sur...")
 
 
Line 5: Line 5:
 
* Recall test state "Running overload" via file menu.
 
* Recall test state "Running overload" via file menu.
  
===taking data===
+
===Taking data===
 +
 
 +
 
 +
[[UL Testing|Back to UL Testing]]

Latest revision as of 13:03, 15 June 2021

Before test

  • Verify control is good by using taps or PWM to run motor, then verify control communicates to appropriate dev tool.
  • Fixture control on heat resistant surface with heatgun pointed at the power module heatsink from the outside.
  • Set up oscilloscope with 3 amp clamps, one voltage probe, and degauss amp clamps.
  • Recall test state "Running overload" via file menu.

Taking data

Back to UL Testing